NCTE

 

QUATERLY REPORT NOVEMBER 2025 TO JANUARY 2026

  1. New Toilets constructed for girls and boys
  2. Extended Cycle Stands place
  3. Newly constructed building for Cyber cafe

 

The land is on Ownership basis in the Name of Denning College for Teachers Education, Tezu

Built-up area square meters

A) Building

S.No. Floor Built-up area in Square Meters
1 Ground floor 1569 Sq mtre
2 First Floor 1569 Sq Mtrs
3 Second Floor 1569 Sq Mtrs
4 Third Floor NA
5 Fourth Floor NA
Total Area 4707Sq Mtrs

B) Building Ground build up  area 8500 Sgmtr

The building has Fire Safety Equipment installed as per the Building By-Laws

For differently disabled persons

  • Infrastructure for different disabled persons is available

Hostel

  • The college don’t have separate Hostel for Girls and Boys

Infrastructure Detail

S.No. Infrastructure Available (Yes/No) Size (Sq. ft.)
a. Classroom

  • classroom 1
  • classroom 2
  • classroom 3
  • classroom 4
Yes
b. Multipurpose Hall yes
c. Library-cum-Reading Room yes
d. ICT Resource Centre yes
e. Curriculum Laboratory yes
f. Art & Resource Centre yes
g. Health & Physical Education Resource Centre yes
h. Multipurpose Playfield yes

Whether following facilities are available in the Institution:

S.No. Infrastructure Available (Yes/No)
a. Principal’s Office yes
b. Staff Rooms yes
c. Administrative Office yes
d. Visitors Room yes
e. Separate Common Room for male & female students yes
f. Seminar Room yes
g. Canteen yes
g. Separate Toilet facility for male & female students yes
i. Separate Toilet facilities for Staff yes
j. Separate Toilet facility for differently abled persons yes
k. Parking Space yes
l. Open space for additional Accommodation yes
m. Store Room yes
n. Play Ground Yes